A CASE STUDY ON TIME AND COST DRIVEN FACTORS OF COMMERCIAL COMPLEX BY USING EVA (EARNED VALUE ANALYSIS) TOOL

Journal: International Journal of Mechanical Engineering and Technology(IJMET) (Vol.8, No. 1)

Publication Date:

Authors : ; ; ;

Page : 357-362

Keywords : Cost Overrun; Time Overrun; Eva (Earned Value Analysis); Construction.;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

Objectives: Now a day's several business complexes are being created. People with busy time schedule show a ton of interest in visiting these malls, so that lots of your time is optimally utilized and each item is formed offered within the business complicated. Methods: There exist many reasons that are accountable for this cost and time overruns. This paper stands to define the primary causes of cost and time driven factors in building (construction) sector &potency function manner, forward future add addressing these overruns. Findings: Building (construction) manufacturing is very vibrant region and shows the significant part within the growth of a Nation, later in Republic of India, construction engineering started a zoom then its freedom. However, construction industry in Republic of India is facing prolonged issues as well as poor depiction of your price (cost)& time, over heads of construction , poor efficiency and over reliant on manpower. Of these trials, is taken into account as an important issue.