The impact factor of constraint on the level of security in the repair and reconstruction of water supply systems
Journal: Construction, materials science, mechanical engineering (Vol.1, No. 71)Publication Date: 2013-09-24
Authors : L. М. Didenko; A. A. Klimenko;
Page : 110-115
Keywords : safety; security; tightness; construction site; trench; water supply; reconstruction.;
Abstract
The article describes the conditions of production of repair and reconstruction of water supply networks in residential areas of cities and existing industrial enterprises and the results of the work carried out to determine the dependence of material costs to ensure the safety of workers from the scope of works in these conditions.
Other Latest Articles
- On the issue of safety in the construction of vertical steel tanks
- Conditions of work in the open and cabinet type offices
- Analysis of the scientific works of outstanding scientists on the methodology of risk management in manufacturing
- Environmental biotechnology utilization of industrial wastes
- Basic Substances under EU Pesticide Regulation: An Opportunity for Organic Production?
Last modified: 2017-04-21 03:39:52