EFFECT OF RESOURCE CURVES IN SCHEDULING AND RESOURCE MANAGEMENT
Journal: IMPACT : International Journal of Research in Engineering & Technology ( IMPACT : IJRET ) (Vol.5, No. 4)Publication Date: 2017-04-21
Authors : Basava Kiran G M; Kiran M Sannakki; T M Mohan Kumar;
Page : 29-32
Keywords : Resource Curves; Over Allocation;
Abstract
Resources are the main attributes for the project to estimate the cost and schedule effective resource usage is given. More priority to manpower resources as they are reused. The critical or skilled resources are more important and managing these effectively is the main objective of this project. Usually manpower resources are used With equal usage of work hours for every activity which will only give a theoretical approach and does not give the real time availability as per the site conditions Resource curves feature is applied to every activity based on the actuals at site and thus it evaluates the actual remaining availability and usage so that project manager can effectively allocate to level there source optimize the schedule. This project deals with different resource curves used in the software and when applied to a real time we capture the effects and generate reports which can be used to achieve the objective.
Other Latest Articles
- OPTIMIZATION OF TURNING PROCESS PARAMETERS FOR EN-31 STEELUSING TAGUCHI METHOD
- POLYHERBAL ADDITIVE PROVES EFFECTIVE AGAINST VERTICAL TRANSMISSION OF IBD
- EFFECT OF SPRAYING WITH WILT-PRUF, GROFALCS AND BENZYL ADENINE ON STORAGE LIFE AND QUALITY CHARACTERISTICS OF FRUITS FIG TREE CV KADOTA (FICUS CARICA L)
- DIVERSITY, STRUCTURE AND COMPOSITION OF SCALE INSECTS POPULATIONS (HOMOPTERA: COCCOIDEA) ON CITRUS IN KABYLIA, ALGERIA
- ACCESSIBILITY OF CASSAVA PROCESSORS TO MASS MEDIA CHANNELS’ INFORMATION ON CASSAVA PROCESSING INNOVATIONS IN SAKI AGRICULTURAL ZONE OF OYO STATE, NIGERIA
Last modified: 2017-05-06 19:53:54