Case Study: Implementation of 5S Methodology in JCB Assembly Business Unit Material Storage
Journal: International Journal of Engineering Research (IJER) (Vol.6, No. 7)Publication Date: 2017-07-01
Authors : By Vipul Dass Abhishek Jain;
Page : 373-378
Keywords : 5S methodology; Supply Chain; SC Management; Logistics; Visual Workplace; and Improvement.;
Abstract
Purpose: The aim of this paper is to present a case of application of 5S methodology to JCB ABU Store to improve its previously flawed in-plant material handling processes. Approach: State of material storage and flow was determined and better methods applied. Findings: On the basis of material storage and flow improvements, it can be determined that adequate care in material storage and handling can make a big difference in daily work processes. Increase of safety, less time for material handling and effective material storage are the benefits obtained. Limitations: Due to the entire system still being in initial setup stages and only two of five assembly lines set up, there is a lot of change expected in the near future and as a result, disruption in material handling processes.
Other Latest Articles
- Named Data Networking
- Power Transformer Protection using Fuzzy Logic based Controller
- The Experimental Study of Eccentric Loadingfor Piled Raft Foundations Settling on Slope Crest
- Social Network Analysis for Web-based Community
- Rainfall-Runoff Modeling Using Artificial Neural Networks and HEC- HMS (Case Study: Catchment of Gharasoo)
Last modified: 2017-11-10 23:13:48