On a Delayed Differentiation Multi-Product FPR Model with Scrap and A Multi-Delivery Policy – II, using Two-Machine Production Scheme
Journal: International Journal of Mechanical and Production Engineering Research and Development (IJMPERD ) (Vol.7, No. 6)Publication Date: 2018-12-31
Authors : Yuan-Shyi Peter Chiu Peng-Cheng Sung; Yung-Ping Liu;
Page : 517-524
Keywords : Optimization; Finite Production Rate; Multi-Product System; Delayed Differentiation; Two-Machine Scheme; Common Cycle Time; Scrap and Multi-Delivery;
Abstract
A finite production rate (FPR) system with delayed differentiation, scrap, and multi-delivery policy using a two-machine production scheme was explored by a conventional calculus method [1]. This paper provides an unconventional approach to this specific problem and demonstrates that its solution procedure can be free of derivatives. The production planner now has an alternative way to study such a complex FPR system.
Other Latest Articles
- Pre-Stress Modal Analysis of A Centrifugal Pump Impeller forDifferent Blade Thicknesses
- Impact of Engine Emissions From HCCI Engine: An Overview
- Evaluation of Critical Success Factors For Six Sigma Implementation in Indian Manufacturing SMEs
- Recent Trends and Advancements in the field of Micro Electrical and mechanical Systems (MEMS) Technology
- Study of Influence of Tool Geometry on Material Flow Pattern in Friction Stir Welding Process Using Finite Element Simulation
Last modified: 2018-01-13 20:32:04