ResearchBib Share Your Research, Maximize Your Social Impacts
Sign for Notice Everyday Sign up >> Login

The Strategy to Support HTGR Fuels For The 10 MW Indonesia’s Experimental Power Reactor (RDE)

Journal: Urania Jurnal Ilmiah Daur Bahan Bakar Nuklir (Vol.24, No. 1)

Publication Date:

Authors : ;

Page : 1-16

Keywords : RDE; Indonesia; HTGR; fuel; strategy;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

The Indonesia's 10 MW experimental power reactor (RDE) is developed based on high temperature gas-cooled reactor (HTGR) and the program of the RDE was firstly introduced to the Agency for National Development Planning (BAPPENAS) at the beginning of 2014. The RDE program is expected to have positive impacts on community prosperity, self-reliance and sovereignty of Indonesia. The availability of RDE will be able to accelerate advanced nuclear power technology development and hence elevate Indonesia to be the nuclear champion in the ASEAN region. The RDE is expected to be operable in 2022/2023. In terms of fuel supply for the reactor, the first batch of RDE fuel will be inclusive in the RDE engineering, procurement and construction (RDE-EPC) contract for the assurance of the RDE reactor operation from 2023 to 2027. Consideration of RDE fuel plant construction is important as RDE can be the basis for the development of reactors of similar type with small-medium power (25 MWe–200/300 MWe), which are preferable for eastern part of Indonesia. To study the feasibility of the construction of RDE fuel plant, current state of the art of the R&D on HTGR fuel in some advanced countries such as European countries, the United States, South Africa and Japan will be discussed and overviewed to draw a conclusion about the prospective countries for supporting the fuel for long-term RDE operation. The strategy and roadmap for the preparation of the RDE fuel plant construction with the involvement of national stakeholders have been developed. The best possible vendor country to support HTGR fuel for long-term operation is finally accomplished. In the end, this paper can be assigned as a reference for the planning and construction of HTGR RDE fuel fabrication plant in Indonesia.

Last modified: 2018-03-02 04:44:35