ResearchBib Share Your Research, Maximize Your Social Impacts
Sign for Notice Everyday Sign up >> Login

Hybrid Socio-Technical & Economic Interaction Networks Application: the Theoretical Cost of Penalties for Non-Delivery of Power Energy

Journal: TEM JOURNAL - Technology, Education, Management, Informatics (Vol.7, No. 1)

Publication Date:

Authors : ;

Page : 74-85

Keywords : Cost of penalties; Decision; Electrical substation; Scheme; Socio-tehnical system;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

The protection of critical infrastructures is essential to the future sustainability of electric power systems. The resilience at the smart meters type threats requires an integrated interdisciplinary approach of the technical and the social components of smart substation. The manner in which the decisions regarding the designing of the electrical substations for the evacuation of the electrical energy produced in a power plant is analyzed and proposed the cost of penalties calculation methodology for nondelivery of power energy from the point of view of socio-technical services.

Last modified: 2018-03-02 07:53:02