DEVELOPMENT OF RISK-BASED STANDARDIZED WBS (WORK BREAKDOWN STRUCTURE) FOR COST ESTIMATION OF APARTMENT’S PROJECT
Journal: International Journal of Civil Engineering and Technology (IJCIET) (Vol.8, No. 10)Publication Date: 2017-10-18
Authors : LENI SAGITA RIANTINI SUPRIADI YUSUF LATIEF BUDI SUSILO; MIRALIA RAJASA;
Page : 822-833
Keywords : Standard WBS; Cost Estimation; Risk factors;
Abstract
The Work Breakdown Structure (WBS) forms the base for most project management processes. Despite each project being unique, most building retain cognate, elemental options that provide the basis for any structure, and these can be standardized and used as a basis for a universal programme of construction works. The standardization of task would enable the automation of project planning processes and hence would result in reduced management cost. This paper proposes the development of WBS Standard and analyzing the possible risks that arise in project implementation then consider those risks for the estimation process. The research focused on investigation of risk factor in activities of Standard WBS from contractors' perspective. The scope of this study was limited to apartment's projects only. Data was gathered using questionnaire survey from contractors who have built apartments. Investigations on the risk factor involved 36 risk factors classified in 6 categories derived from WBS's levels. Risk analysis found 6 high risks in 3 categories.
Other Latest Articles
- WATER QUALITY INDEX: A TOOL FOR EVALUATION OF SURFACE WATER QUALITY
- IMPORTANT PERFORMANCE ANALYSIS AS A STRATEGIC PLANNING TECHNIQUE IN BUS RAPID TRANSIT DEVELOPMENT PROGRAM
- MEASURING REGIONAL ECONOMIC IMPACT OF CIPULARANG TOLL ROAD INVESTMENTS: USING AN INPUT-OUTPUT MODEL (CASE STUDY: BANDUNG DISTRICT)
- ANALYSIS OF LOCAL SANDED SOIL WITH COCONUT COIR FIBER REINFORCEMENT AS SUBGRADE ON STRUCTURAL PAVEMENT
- CEMENT DUST EXTRACTION TOOL WITH FOGGING METHOD
Last modified: 2018-04-20 16:25:40