Cycle Time Reduction Studies in Threading
Journal: International Journal of Mechanical and Production Engineering Research and Development (IJMPERD ) (Vol.8, No. 2)Publication Date: 2018-04-30
Authors : K. Palaksha Reddy Deepak Kumar R. Venkatraman; V. Vishweshvar;
Page : 149-156
Keywords : CNC Programming; Canned Cycles; Threading Cycle; G76 & G92;
Abstract
Cycle time reduction is one of the critical aspects for achieving successful production of products. Prompt delivery, high quality of products have now become the significant factors for customer satisfaction. The various methods of programming in CNC systems ensure machine ability, but at the same time optimization and increase in productivity are to be enhanced. Various programming methods in manufacturing of threads were studied in this research work. The cycle times of three different work piece materials during the G76 threading cycle were noted. Then, we proposed G92 cycle of threading to reduce the cycle time. The new process enabled variable depth of cut, less number of passes resulting in cycle time and it is easy to use. The work was practically implemented on a CNC lathe machine and the data related to the experiments were recorded. This method was applied to 10 other work pieces, wherein it was noted that for all types of threads manufactured, a considerable amount of time is being saved and the productivity was increased marginally.
Other Latest Articles
- Comparison of Various Models Implemented Using Linear and Non-Linear SystemIdentification Methods for Cement Grinding Process Using Vertical Roller Mill
- Evaluation of Efficacy of Advanced Sign Anti Aging Cream in Imparting Anti Aging Attributes: An Open Label Three Arms, Monocentric Comparative Study
- Performance Studies on diesel Engine Stabilized with TBC and Glycine Max Blended Oil
- Optimization of Elastomeric Passive Engine Mount Using Direct Optimization Method
- Influence of Addition of Silicon on Mechanical Properties of Aluminium – Zinc Alloy
Last modified: 2018-07-20 19:16:38