TECHNIQUE OF THE OPERATIVE FOR ECAST OF WIND SPEED AND CONSUMPTION POWER FOR WIND GENERATOR
Journal: Science and world (Vol.1, No. 49)Publication Date: 2017-09-25
Authors : Buyalsky V.I.;
Page : 14-19
Keywords : method; rotational speed; forecast; random process; wind speed; time interval; operating decisions.;
Abstract
The reason for development of effective automated control of wind generator is proved. The tech- nique for timel y change of blades' position based on the developed mathematical model of make - time estimation of the pitch engine according to the wind speed change on the future time span (taking into account the system's response time and time necessary for the blade's turn on the demanded impinging angle) is suggested. The choice of mathemati- cal model of wind speed forecasting and power consumption is proved. The time interval of the operative forecast of external disturbances is suggested.
Other Latest Articles
- THE USE OF RESEARCH SKILLS AND ABILITIES OF STU DENTS IN THE STUDY OF THE TOPIC "PRODUCTION OF SULFURIC ACID"
- ON THE WAVES IN THE TUBE WITH THE LIQUID FLOWING IN IT CONSIDERING RIGIDITY OF THE ENVIRONMENT
- KIRGIZ TÜRKÇESİNDEN TÜRKİYE TÜRKÇESİNE DEYİM AKTARMADAKİ BAZI SORUNLAR ÜZERİNE “MANAS DESTANI” ROMANI ÖRNEĞİYLE
- The Role of Petroleum in Kazakhstan Economy
- The Validity and Reliability Study for the Turkish Version of the Dyadic Almost Perfect Scale
Last modified: 2018-08-07 21:58:51