CONSTRUCTION EQUIPMENT PRODUCTIVITY AND COST ECONOMICS IN HIGHWAY PROJECTS: CASE STUDY PART II (SEASONAL VARIATION STUDY)
Journal: International Journal of Advanced Research in Engineering and Technology (IJARET) (Vol.9, No. 3)Publication Date: 2018-05-31
Authors : N. SHYAMANANDA SINGH;
Page : 163-171
Keywords : Construction Equipment; Productivity; Cost Economics;
Abstract
The present work forms the second part of the case study series. The first part had discussed about the site specific study of productivity and cost economics of major construction equipment. The second part of the study focusses on the seasonal variation of the productivity as well as the cost components of highway construction equipment.
Other Latest Articles
- CONSTRUCTION EQUIPMENT PRODUCTIVITY AND COST ECONOMICS IN HIGHWAY PROJECTS: CASE STUDY PART I (SITE SPECIFIC STUDY)
- STUDY THE STRUCTURAL AND OPTICAL PROPERTIES OF 10% MAGNESIUM DOPED ZINC OXIDE THIN FILMS
- AN ENHANCED METHOD OF ELECTRICAL ENERGY CONSERVATION FROM ROTATING CEILING FAN
- SCALAR BASED CMV REDUCTION METHOD FOR AN EVEN LEVEL INVERTER USING OPEN-END WINDING INDUCTION MOTOR DRIVE
- RECONFIGURATION OF ELECTRICAL DISTRIBUTION NETWORK USING ARTIFICIAL NEURAL NETWORK
Last modified: 2018-12-10 16:18:38