ResearchBib Share Your Research, Maximize Your Social Impacts
Sign for Notice Everyday Sign up >> Login

THE CALCULATION OF THE UPPER & LOWER COMPONENTS OF THE NEW RAILWAY ROAD IN DEAD LINES REACTIVATION IN BABAT-JOMBANG AS A CROSS SUPPORT

Journal: International Journal of Civil Engineering and Technology (IJCIET) (Vol.10, No. 3)

Publication Date:

Authors : ; ;

Page : 1728-1738

Keywords : Mass transport; transport infrastructure; the rail network;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

Railways public transport play important roles in Indonesia in which it becomes one mode of national transportation system with bulk freight characteristics and it contains more advantages compared with other transport modes. The research aimed to know the rail class calculation on the reconstruct of line tripe-stubs based on the operation of the train and its load. Besides, this study also aimed to test the upper components to know the class of the railway by using UIC (Union International Railway) and PD 10 (Peraturan Dinas 10). Based on the result of the planning calculation the reconstruction of rail roads from Babat to Jombang, it was found that a new rail road which include rails type 50, concrete pads, ballast and sub ballast, and track from Babat to Jombang, later it can be passed by using a locomotive type CC 202 based on the calculation of the rail class by using Passing Tonage the result is UIC 6. Meanwhile, based on the Peraturan Dinas 10 possessed by PT. Kereta Api, and the locomotive's load axle and speed, the rail class on that line is planned to use II rail class.

Last modified: 2019-05-17 23:05:37