ANALYSIS OF REDUCTION IN PEDESTRIAN WAITING TIME FOR CROSSING ROUNDABOUT
Journal: International Journal of Civil Engineering and Technology (IJCIET) (Vol.10, No. 3)Publication Date: 2019-05-08
Authors : APEKSHA ADESH MENDHE N.J.MISTRY; RAKESH KUMAR;
Page : 1840-1850
Keywords : AHP; Crossing; Fractional Solutions; Pedestrian; Roundabout; Waiting time;
Abstract
The purpose of this study is to minimize pedestrian waiting time to cross the roundabout. This study employed an analytical hierarchy process for crossing points at the roundabout. AHP decision making of level 1-3 micro-alternatives and its ranking is represented in the hierarchical structure. The prime objective of producing a combination of solutions ultimately reduces wait time <6 secs, as long waiting time is a persisting issue. Combination of fractional solutions regarding fuzzy weights, represents reliability, efficiency, economy, traffic literacy, optimality, and waitingtime thinning. This result to maximize the user performance on the crossing site. Spiderweb represents commendable solutions obliged to the pedestrian crossing. Microscopic evaluation and time thinning factor also save budget, time and serves ease in crossing recommendations. Improved Pedestrian crossing and thinning wait time appear in higher fuzzy weights.
Other Latest Articles
- EFFECT OF STIFFNESS OF STAIRCASE, CORE AND BRICK WALLS IN RC FRAMED STRUCTURE SUBJECTED TO WIND LOAD
- COMPARATIVE STUDY OF DIAGRID STRUCTURE SYSTEM IN HIGH RISE BUILDINGS WITH BRACED FRAME STRUCTURE
- EVOLUTION OF ENGINEERING STANDARDS AND ESTIMATION METHODS
- STRENGTHENING PROJECT PERFORMANCE WITH ORGANIZATIONAL CULTURE AND PROJECT MANAGEMENT OFFICE (PMO) ON THE CONSTRUCTION OF HIGH-RISE BUILDING
- FUZZY SET THEORY APPLYING TO ACCIDENT OR EMERGENCY FORECAST: CASE STUDY OF SAFETY BREACH IN MINE
Last modified: 2019-05-17 23:33:04