Delay Analysis of Pressure Vessels Fabrication using Fuzzy FMEA

Journal: International Journal of Mechanical and Production Engineering Research and Development (IJMPERD ) (Vol.9, No. 2)

Publication Date:

Authors : ; ;

Page : 83-90

Keywords : Delay; Brainstorming; Forum; Discussion Group (FGD). FMEA & Fuzzy FMEA;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

Every day, development continues to be carried out for various interests that will lead to the goal of improving people's welfare. The project is not only carried out in the field, but there are supporting jobs carried out in other locations such as equipment or certain parts which are usually carried out in workshops or sub-contracted to another company, one of which is pressure vessels. The number of project delays in the world and the manufacturing sector in Indonesia is quite high. In this study, will discuss the delay caused by fabrication, pressure vessel project, which benchmarked the Fabricator in Banten. Brainstorming is used to gather information about potential delays and the Focus Discussion Group (FGD) is used to determine the agreement of the factors that cause delays, Severity value, Occurency and Detection value. Risk Priority Nunber (RPN) obtains the result of the multiplications Severity x Occurency x Detection. 15 factors delay in getting as a cause of delay. More high the value of the RPN, higher the ranking of the causes of delay. In this study Fuzzy FMEA supports FMEA results in several rankings

Last modified: 2019-05-20 20:14:51