MINIMIZATION OF EXPECTED MAKESPAN IN FLOWSHOP USING CBM
Journal: International Journal of Mechanical Engineering and Technology(IJMET) (Vol.10, No. 8)Publication Date: 2019-08-20
Authors : D. Sanjeeva Rao; M. Srinivasa Rao; V.V.S. Kesavarao;
Page : 232-243
Keywords : Scheduling; simulation; condition based maintenance; time deterioration;
Abstract
Manufacturing units have to meet concurrently several requirements such as: quick reaction to market demand, high product quality, justifiable manufacturing costs and well-timed deliveries, etc. Generally, the shop floor level personnel treat maintenance and processing times in segregation for the purpose of scheduling, joint consideration of equipment maintenance and scheduling on the performance of the manufacturing system is taken into consideration in this paper. In practice machines may be temporarily not available for many reasons, such as unforeseen scheduled preventive and breakdown maintenance, operator non availability, spare parts damage, etc. An effort is made to schedule a flowshop problem with time deterioration under “Condition Based Maintenance” (CBM) constraints to minimize the expected makespan. The randomness of the problem is tackled by simulation. Genetic and tabu search algorithms applied to tackle such hard problem. Experimental studies conducted and the results are promising in nature.
Other Latest Articles
- STUDY OF THE IMPACT OF OPERATIONAL PARAMETERS ON PRODUCTION OF HOT METAL IN A BLAST FURNACE
- THE THEFT OF BANK CUSTOMER DATA ON ATM MACHINES IN INDONESIA
- AESTHETIC ASPECTS OF MALAY POTTERY HERITAGE (LABU SAYONG)
- FUZZY LOGIC AND PROBABILITY FUNCTIONS
- DESIGNING THE REAR UPRIGHT OF AN ALLTERRAIN VEHICLE (ATV) THROUGH A PROCESS METHODOLOGY
Last modified: 2020-01-07 15:52:11