SLITS REDUCTION BY APPLYING OVERALL EQUIPMENT EFFECTIVENESS OF A PLASTIC FILM PRODUCTION PLANT
Journal: International Journal of Mechanical Engineering and Technology(IJMET) (Vol.10, No. 9)Publication Date: 2019-09-20
Authors : Chalida Udomraksasakul; Sawitree Phieboolsilapa;
Page : 160-163
Keywords : Overall Equipment Effectiveness;
Abstract
This study has an objective to reduce waste in packaging and pallet wrapped plastic film production process of the case study plant. The result from the improvement by 16 waste reduction processes and Overall Equipment Effectiveness (OEE) can reduce the slits from 15,654.02 kg/month which cost 782,701.05 THB/month to 10,048 kg/month or 502,400 THB/month or reduced by 65.94%
Other Latest Articles
- A MODELING AND SIMULATION OF POSITION CONTROL OF ELECTROSTATIC SUSPENSION SYSTEM WITH UNCERTAIN FRINGING FIELD
- STATIC CHARACTERISTIC AND DYNAMIC PERFORMANCE OF HYBRID COMPOSITE BRAKE LINING PADS
- REINVENTING TRADITION THROUGH KELINGKAN EMBROIDERY HANDICRAFT IN MALAYSIA
- HEAT TRANSFER MAGNIFICATION IN DOUBLE TUBE HEAT EXCHANGER WITH NANOFLUID AND TUBE INSERT
- THE PHILOSOPHICAL DIMENSION OF TECHNOLOGY
Last modified: 2020-01-07 16:41:58