ResearchBib Share Your Research, Maximize Your Social Impacts
Sign for Notice Everyday Sign up >> Login

OPTIMUM VALUE OF QUALITY COST IN WATER STRUCTURES PROJECTS BY USING CONFORMANCE-NONCONFORMANCE (CNC) MODEL

Journal: International Journal of Civil Engineering and Technology (IJCIET) (Vol.10, No. 11)

Publication Date:

Authors : ;

Page : 365-374

Keywords : cost of quality; conformance cost; nonconformance cost; water structures projects;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

In Egypt, which has one of the fastest developing construction markets in Middle East, it is very important to estimate the cost of quality of these projects. The objective of this paper is to estimate the cost of quality and determine its optimum values in the Egyptian construction projects by applying the conformance-nonconformance (CNC) model to water structures projects. The research showed that the actual cost of quality (COQ) value represents 1.54% of the entire project cost and that the optimal quality cost value was calculated to be 1.99% of the entire quality cost. On the other hand, conformance cost of quality was found to be 1.10% and nonconformance cost of quality was found to be 0.44% of the total project cost.

Last modified: 2020-01-17 16:30:51