TOWARDS EFFECTIVE EARNED VALUE TECHNIQUE IN CONSTRUCTION MANAGEMENT
Journal: International Journal of Civil Engineering and Technology (IJCIET) (Vol.10, No. 12)Publication Date: 2019-12-11
Authors : Ahmed Nouh Khaled Aboulata Hussein;
Page : 384-394
Keywords : Earned Value Management System; Earned Value Analysis; Earned Value Technique; Earned Value Calculation; Project Management; Project Assessment; Project Evaluation; Project Review; Project Audit;
Abstract
In traditional project management, experts used to monitor each of cost and schedule apart from each other; however, this is not the clever way to do that. Earned Value is considered the best technique to correlate, analyze and compare the project's scope, schedule and cost to evaluate current project performance and estimate future values required for planning of corrective action, if needed. This paper aims to illustrate the basic information required for creating Earned Value Management System through applying of simple example in addition to reviewing its main advantages and disadvantages. Also, this paper will present the evolution of the earned value technique in modern project management field such as the new reporting approach and earned schedule technique.
Other Latest Articles
- BIODIVERSITY IN BUILT ENVIRONMENT
- STATISTICAL POWER OF AN ALTERNATIVE TEST FOR COMPARISON OF SURVIVAL DISTRIBUTIONS WITH CROSSED SURVIVAL CURVES IN THE PRESENCE OF CENSORING: A SIMULATION STUDY
- THE RULES ON CRIMINAL CASE REVIEW IN INDONESIA BASED ON JUSTICE
- TREATMENT OF WASTEWATER CONTAMINATED WITH DYES USING CONVENTIONAL AND NATURAL COAGULANTS IN SINGLE AND TERNARY SYSTEMS
- FLEXIBLE PAVEMENTS FOR WASTE PLASTIC DISPOSAL
Last modified: 2020-01-17 19:03:54