Power Flow Analysis of the Enhanced Proposed 330kV Transmission Network of the Nigeria Grid
Journal: Mehran University Research Journal of Engineering and Technology (Vol.38, No. 4)Publication Date: 2019-10-01
Authors : Festus Osazee Agbontaen; Joel Osarumwens Egwaile; Ignatius Kema Okakwu;
Page : 875-884
Keywords : Transmission Line; Network; Loadability; Load Flow; Maximum Load; Power Station.;
Abstract
The Nigeria's power sector transmission infrastructure continues to be challenged as it still remains the weak link in the electricity supply chain. The Nigerian Federal Government on its Roadmap for power sector reform highlighted that to accommodate the planned increase in generation capacity, there was need for a 30% increase in the “true deliverable” transmission capacity of the country's 330kV network. But the technical feasibility of this plan is an issue to be considered. In this work, the existing 330kV Nigeria transmission network was expanded by the introduction of new lines and power stations, simulation was carried out and the effect was analyzed using Newton-Raphson algorithm in ETAP 12.6. The base case operating condition as obtained from the power flow on which the various transfer cases were implemented, gives a fair generation and loading pattern of the Nigerian grid. The total installed generating capacity of the base case considered was 11,948MW out of which 4,347.21MW was available for load level of 3,633.6MW. Result shows that the maximum load ability of the enhanced network was increased to 238.4% compared with the existing network when the Newton – Raphson iteration method was applied.
Other Latest Articles
- Investigation of Internet of Things Handover Process for Information Centric Networking and Proxy Mobile Internet Protocol
- Analysis of Closed Loop Production System Using Orthogonal Array and Integer Programming Optimization
- An Efficient Computer-Aided Diagnosis System for the Analysis of DICOM Volumetric Images
- Heritage at Stake: Discourse Concerning the Causes of Damages Occurred to the Historic Hostel Structures Built in British Era in Karachi
- Identifying the Wasted Spaces within Hospital Buildings in Pakistan
Last modified: 2020-04-12 02:22:16