Project Implementation Strategy for Environmental Limitations in TNBTS

Journal: International Research Journal of Advanced Engineering and Science (Vol.4, No. 3)

Publication Date:

Authors : ;

Page : 91-95

Keywords : Project Performance; SWOT; TNBTS;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

One of the spectacular international-scale tourist attractions visited by tourists in East Java, namely Bromo Tengger Semeru National Park (TNBTS). One of the main causes of the lack of development of tourism objects in the TNBTS area is the limited infrastructure, besides the current condition of tourism facilities and infrastructure which have been damaged. TNBTS is a construction project that has different characteristics from one project to another. The existence of unique and different natural conditions, the work carried out at the project location will be different. Accessibility to the project location is very difficult due to the steep road. The difficulty of the affordability of project locations is an obstacle for stakeholders when implementing development in the TNBTS area. Limited environmental conditions in the TNBTS area will affect the availability of project resources. Respondents in the study were contractors, consultant supervisors, planner consultants, other parties, BBTNBTS, and related agencies. The method used in solving the problem is SWOT. The strategy improvement proposal is in accordance with the SWOT analysis, namely, for stakeholders the ability of human resources to control environmental conditions in TNBTS and the use of local personnel that are suitable for qualifications. For service providers, it is necessary to conduct a field review first and understand the characteristics of environmental conditions in TNBTS, implementers must truly understand the existing work plan requirements (RKS), each service provider needs to learn and know the conditions that often hamper the project implementation in TNBTS. So, can have alternatives in planning and implementation related to environmental limitations in TNBTS

Last modified: 2020-05-30 16:51:27