Condition Assessment of Concrete in the 2 PSC Girders of the Pipe Conveyor Bridge of 2 X 660 MW Udangudi Super Critical Thermal Power Project at Thiruchendur
Journal: International Research Journal of Advanced Engineering and Science (Vol.4, No. 4)Publication Date: 2020-08-15
Authors : Dr.R.Sundaravadivelu; G.Jayarajan; Dr.S.Arivalagan;
Page : 304-309
Keywords : ;
Abstract
M/s ITD Cementation India Ltd, Thiruchendur, intended to assess the condition of concrete in the Prestressed Concrete (PSC) Girders of the Pipe Conveyor Bridge of 2 X 660 MW Udangudi Super Critical Thermal Power Project at Thiruchendur. A consultancy project proposal on ‘Condition Assessment of Concrete in the PSC Girders of the Pipe Conveyor Bridge of 2 X 660 MW Udangudi Super Critical Thermal Power Project at Thiruchendur' was submitted by M/s Hitech Concrete Solutions Chennai Pvt Ltd, Chennai. M/s ITD Cementation India Ltd, Chennai confirmed the scope of work and entrusted the work to M/s Hitech Concrete Solutions Chennai Pvt Ltd, Chennai. The site investigation to assess the condition of concrete in the PSC Girders of the Pipe Conveyor Bridge of 2 X 660 MW Udangudi Super Critical Thermal Power Project at Thiruchendur was carried out by M/s Hitech Concrete Solutions Chennai Pvt Ltd, Chennai on 17-09-2019. This report outlines the details of the site investigation carried out to assess the quality of concrete, analysis of data obtained during the site investigation and the findings on the quality of concrete in the structure.
Other Latest Articles
- Factors that Caused Farmers to Resign from Partnership Members (Case Study of the Goat Farmers Group, Doko District, Blitar Regency)
- Feed Nutrition Study of Several Broiler Partnerships in Blitar Regency on Product Quality
- Flexural Strength of Precast Concrete Panel with Onyx Waste by Surface Grinding Finishing Process with 4mm Thickness
- Flexural Strength of Precast Concrete Panel with Onyx Waste by Surface Grinding Finishing Process with 4mm Thickness
- Innovative Solution to Eliminate Sn Flakes Migration at Package Singulation on a QFN Sn Plated Stepped Cut Design
Last modified: 2020-06-16 16:31:16