Technical rationing of the construction technology of reinforced concrete floor slabs using non-removable void formers
Journal: RUDN Journal of Engineering Researches (Vol.20, No. 2)Publication Date: 2020-01-15
Authors : Dmitry Topchiy; Alina Bolotova; Aleksey Vorobev; Alevtina Atamanenko;
Page : 155-162
Keywords : technical rationing; non-removable voidforming liners; holders; time rate; production norms;
Abstract
Technically sound standards of time and production standards are designed to improve production efficiency, technical and economic indicators of construction enterprises, timely commissioning of buildings and structures being erected, as well as ensuring the proper organization of workers' wages. Labor standards are used in determining the need for construction machinery and equipment, the required number of workers, and also serve as the basis for the development of network and calendar schedules that are part of the project of construction organization (PCO) and the project of construction production (PCP). Standards of time and standards for the production of most of the construction work are contained in the collections of common norms and rates and state elemental estimated norms. However, in the conditions of continuous development and introduction of new production technologies, there is a need to update and refine the existing technical regulation database. Standards of time, corresponding to the modern level of technical development and reflecting the advanced experience of workers, allow to make the right choice when analyzing the most economical ways of producing work. Definition and removal of production standards is to determine the weighted average number of working hours to perform a particular technological operation, while taking into account the conditions of production of this workflow, the numerical and qualification composition of workers.
Other Latest Articles
- Acoustic flow meter performance assurance outside the limits of measurement
- Modeling the set of blade profiles of a gas turbine engine
- Development of methodology for calculation of discontinuous circular welds in torsion
- Experience and opportunities of space systems applications of Earth remote sensing to prediction gold mineralization on difficult to approach areas on the example of the Polar Urals
- Satellite constellation design of on-orbit servicing space system for Globalstar satellites
Last modified: 2020-09-21 07:47:02