Diminishing the Earliness and Tardiness of AGV using PSBCSP Algorithm
Journal: International Journal of Mechanical and Production Engineering Research and Development (IJMPERD ) (Vol.10, No. 3)Publication Date: 2020-06-30
Authors : Mahalakshmi Swathi Pai M R Murugesan;
Page : 13971-13980
Keywords : Flexible Manufacturing System; Automated Guided Vehicles; Earliness/Tardiness; Positive Selection Based Clonal Selection Principle;
Abstract
As the earliness of the AGVs results in waiting and tardiness of AGVs results in temporary storage of the products in the shop floor, it is essential to minimize the earliness and tardiness of AGVs. Therefore we are proposing a mathematical optimization program in order to minimize the total earliness and total tardiness of AGVs in the manufacturing system. Since it is difficult to solve the mathematical program by conventional method, an optimization technique namely Positive Selection Based Clonal Selection Principle algorithm is used to obtain the optimal solution. The proposed algorithm is tested with the numerical examples and also compared with the other methods in the literature.
Other Latest Articles
- Comparison of Student Graduation Classification Analysis Based on Study Length Using Naïve-Bayes and C4.5 Algorithms
- Analysis of Factors Affecting the Interest of People to Use DANA Application Using Principal Component Analysis Method (PCA)
- Lightweight Self-Compacting Concrete Using Lightweight Expanded Clay Aggregate
- New Records of Carabid Beetles (Coleoptera: Carabidae) in Eastern Visayas, Philippines
- Analysis of Value Added on Entrepreneurship of Beef Shredded and Jerky in Kupang Town East Nusa Tenggara Province
Last modified: 2020-09-30 18:08:13