COMPARATIVE STUDY OF STANDBY COMPRESSOR SYSTEMS WITH AND WITHOUT PROVISION OF PRIORITY TO FAILED COMPRESSOR UNIT
Journal: International Journal of Applied Mathematics & Statistical Sciences (IJAMSS) (Vol.3, No. 6)Publication Date: 2014-11-30
Authors : UPASANA SHARMA; JASWINDER KAUR;
Page : 1-8
Keywords : Compressor Unit; Regenerative Point Technique; Refrigeration System; Semi-Markov Process;
- SIMILARITY SOLUTION FOR THE FALLING PLUMES IN A GRAVITY MODULATED BIOCONVECTION
- THE EFFECT OF GRAVITY INCLINATION ON HYDROMAGNETIC NON-LINEAR CHEMOTACTIC BIOCONVECTION
- Intensity Modulated Radiation and Volumetric Modulated Arc Therapies in Breast Cancer
- Method of the vector of similarity to ideal solution in alternatives
- Investigating the Efficiency of the Logistics Performance Index (LPI) Weighting System Using the Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) Method
Abstract
The present paper is an attempt to compare two standby systems consisting of two compressor units where one compressor is in operative state and other is in standby state at initial stage. In Model 1 priority is given to failed compressor unit whereas in Model 2 there is no concept of priority. Any major failure or annual maintenance brings the operating unit to a complete halt. It has been observed that the unit can fail due to various types of failures which can be categorized as serviceable type, repairable type and replaceable type. For availability analysis of the unit real failure as well as repair time data from a milk plant have been collected and measures of unit effectiveness i.e. availability and mean time to unit failure for both the models has been computed graphically as well as numerically by using semi-Markov process and regenerative point technique.
Other Latest Articles
Last modified: 2015-01-08 19:37:44