Performance Analysis of Central Gas Turbine Power Station, Edjeba, Delta State, Nigeria
Journal: International Journal of Science and Research (IJSR) (Vol.2, No. 3)Publication Date: 2013-03-05
Authors : Adegboyega Gabriel A; Famoriji John O;
Page : 511-517
Keywords : Plant Capacity; Plant Use Factor; Load Factor; Utilization Factor;
Abstract
In this research paper, basic factors: Plant Capacity, Plant Use Factor, Load Factor and Utilization Factor were used to estimate the performance of a Central Gas Turbine Power Station. Information data were obtained from Edgeba gas turbine power station Delta state, Nigeria. These are inventory records of monthly energy generation between 2002 and 2012 and operational statistics. The data were used to determine the plant capacity, plant use factor, load factor and utilization factor. However, Edgeba gas turbine power station has Capacity Factor of 20.4% as against the target of 40-65% (ISO Standard), Plant Use Factor of 29.14546% as against the target of 50-70% (ISO Standard), Load Factor of 81.76% as against 80% (ISO Standard), and Utilization Factor of 49.1-58.9% as against 85% (ISO Standard (Gas Turbine Procurement, Conditions and Ratings, 1997).
Other Latest Articles
- Sociolinguistics Measure for Paternal Gender Dominance over Maternal One among Javanese Muslim
- Morphology, X-ray Diffraction and Solubility of Underutilized Legume Starch Nanocrystals
- Wireless Fetal Monitoring
- IT Relatedness Effect on IT Outsourcing Strategies and Knowledge Management on Organizational Performance Impact on Provincial Government Agencies Papua
- Elementary Teacher Student Perspective to Natural Science Learning as Accomodate Effort of Need Study Capability
Last modified: 2021-06-30 20:14:29