A Review Paper on Identification of Crucial Site Layout Planning Factors in Construction
Journal: International Journal of Science and Research (IJSR) (Vol.4, No. 5)Publication Date: 2015-05-05
Authors : Supriya Vinod Shetty; Anandrao R. Deshmukh;
Page : 126-127
Keywords : Site layout planning; crucial factors; techniques; site space; facilities;
Abstract
Site space is a limited resource where all the facilities are to be provided. Site space being limited, appropriate site layout planning of temporary facilities is crucial for enhancing the productivity and safety of construction site. Site layout planning, however is a complex problem and researchers have attempted to solve it using variety of optimisation-based techniques. Various techniques like Genetic algorithm, simulation technique and ant colony optimisation techniques are used for site layout planning. This paper attempts to identify crucial factors in construction affecting site layout planning. It includes identifying facilities that are temporarily needed to support construction operations on a project but do not form a part of the finished structure.
Other Latest Articles
- A Review on Electricity Generation Using Mobile Network Radiations
- In Vitro Plant Regeneration of Luffa acutangula Roxb. Var amara Lin.: An Important Medicinal Plant
- A Right Ventricle Type-B Thrombus with Massive Pulmonary Thrombo-Embolism: Crucial Role of Echocardiography
- Laboratory Evalation of Iron Deficiency Animia in Pregnant Women in Diyala ?Iraq
- Refactoring and Detection of Bad Smells of Coding Using Larger Scale and Critical Incident Technique
Last modified: 2021-06-30 21:46:31