A LEAN SIX SIGMA APPROACH TO REDUCE WAITING AND REPORTING TIME IN THE RADIOLOGY DEPARTMENT OF A TERTIARY CARE HOSPITAL IN KOLKATA
Journal: International Education and Research Journal (Vol.2, No. 6)Publication Date: 2016-06-15
Authors : Dr Brig . A.P. Pandit Tanima Debmallik;
Page : 21-28
Keywords : Lean Six Sigma; Pre-test waiting time; post-test report generation time;
Abstract
A Lean Six Sigma (DMAIC) approach was taken to study the issue of the imaging services cycle turnaround time (TAT) of the Radiology Department of a Tertiary care Hospital Kolkata. By conducting a Gemba Walk interview (Annexure 1) and Time motion study (Annexure 2), the entire process was mapped and areas causing delay were identified in the defining and measuring stage. Pareto analysis yielded the root causes of delay in the analysing stage. In the intervention stage practical approaches were undertaken to increase patient orientation and preparedness for the scan thereby decreasing pre-test waiting time and streamlining of operations. The reporting process ultimately aided in reduced pre-test and post-test waiting times.
Other Latest Articles
- THE STRANGER WITHIN : TOWARDS A PSYCHODYNAMIC GESTALT PEDAGOGY OF THE SELF
- AN INTRODUCTION TO GST-THE COMPREHENSIVE INDIRECT TAX REFORM OF INDIA
- AN ANALYSIS OF MENTAL TOUGHNESS AMONG INTERNATIONAL MALE VOLLEYBALL PLAYERS OF 12th SOUTH ASIAN GAMES
- RESPONSIBLE BUSINESS THROUGH COMMUNITY INVOLVEMENT: ANALYZING THE COMMUNITY INITIATIVES OF ELECTRONIC GIANTS IBM AND SONY
- CHANGING THE ERA OF IMPLANT DENTISTRY USING A WONDER TOOL: ELECTRICAL MAGNETIC MALLET
Last modified: 2022-04-20 15:12:51