Optimal Sizing of Solar Off Grid Microgrid Using Modified Firefly Algorithm
Journal: International Journal of Scientific Engineering and Science (Vol.8, No. 8)Publication Date: 2024-08-15
Authors : Mana Abusaq; Mohamed A. Zohdy;
Page : 8-16
Keywords : ;
Abstract
This paper presents a novel approach for determining the optimal sizing of solar off-grid microgrids through the utilization of a modified Firefly Algorithm (FA). Off-grid microgrids, powered primarily by solar photovoltaic (PV) systems, offer a sustainable solution for providing electricity to remote areas. However, the optimal design and sizing of such microgrids remain a challenging task due to the dynamic nature of renewable energy sources and varying energy demands. In this study, a Modified Firefly Algorithm (MFA) has been designed especially for optimizing the sizing of solar off-grid microgrids. MFA improves the convergence speed and solution quality, even in a complex multi-objective optimization problem. The effectiveness of the proposed approach is demonstrated through a case study involving the design and optimization of a solar off-grid microgrid. Comparative analysis with standard firefly algorithm (FA) illustrates that Modified Firefly Algorithm (MFA) achieves optimal sizing solutions with improved efficiency and accuracy. The findings of this research contribute to advancing the design and implementation of sustainable energy solutions powered by renewable energy sources.
Other Latest Articles
- Detection of Iodide Using a Fluorescent Chemosensor Based on Quinaldinium and Imidazole Moieties
- A Review on Efficient Micropropagation by Ex vitro Rooting
- Numerical Modeling of Permeability in Porous Media: Integrating Experimental and Computational Approaches for Enhanced Fluid Flow Prediction in Petroleum Reservoirs
- Comparative Analysis of Interest in Becoming a Customer of Sharia Banks and Conventional Banks
- Influence of Work Discipline and Competence on Performance Through Organizational Commitment as an Intervening Variable (Study on Production & Project Function PT Pertamina Hulu East Kalimantan)
Last modified: 2024-09-22 19:15:59