PRODUCTIVITY IMPROVEMENT IN LIGHT & MEDIUM DUTY CHASSIS ASSEMBLY LINE AT VE COMMERCIAL VEHICLE
Journal: International Journal of Engineering Sciences & Research Technology (IJESRT) (Vol.4, No. 8)Publication Date: 2015-08-30
Abstract
The research was done in sub - assembly area and the main assembly line in Volvo Eicher Commercial Vehicle plant, plant deals with continuous production & supply of Low, Medium & Heavy commercial vehicles to its customers. Research given the work content & variability reduction of MCV model (11.10 E - WB) in Main assembly line. Present line has very less automation & most of the operations are done manually. That causes the work content & variability are more in each station of Main assembly line. Present line has a problem of line balancing and also the problem of tools & fixtur es at various stations. The requirement of the vehicles depends on the demand of the customers. Usually, the marketing peoples convey the requirement of the vehicles to the production planning and control department
Other Latest Articles
- STRESS REDUCTION BY INTRODUCING STRESS RELIEVING FEATURES OF SPUR GEAR USED IN LATHE HEADSTOCK
- A SURVEY ON DATA MINING TECHNIQUES, THEIR APPLICATION AND FUTURE SCOPE
- A SURVEY ON EDUCATIONAL SYSTEM USING MANAGEMENT INFORMATION SYSTEM
- EVALUATION OF WATER QUALITY OF NARMADA RIVER WITH REFERENCE TO PHYSICO - CHEMICAL PARAMETERS
- EXPERIMENTAL STUDY ON BEHAVIOR OF TERNARY BLENDED CRIMPED STEEL FIBER REINFORCED CONCRETE BEAM IN SHEAR
Last modified: 2015-08-06 19:51:05