ResearchBib Share Your Research, Maximize Your Social Impacts
Sign for Notice Everyday Sign up >> Login

Reducing assembly time and Rework of wheel chair

Journal: International Journal of Analytical, Experimental and Finite Element Analysis (Vol.2, No. 2)

Publication Date:

Authors : ; ;

Page : 55-59

Keywords : ;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

Improving the productivity of the organization is the primary objective. If a wrong part assembly occurs then it leads to excess time consumption with loss of money. A new approach called Maynard Operation Sequence Technique (MOST) implementation, with an approach to Time study of an assembly workstation and reducing Non value adding activities(NVA). Poka Yoke method can be used for mistake proofing of assembly of wrong bracket on back frame of wheel Chair assembly and can also be used in defining holes during assembly of back frame, seat, mechanism, left hand rest, right hand rest. Certain devices such as fixture can be used. Automation can be applied with the help of human intervention with understanding critical points to design a Fixture and mechanical devices over the sensing devices

Last modified: 2015-09-20 15:16:18