ResearchBib Share Your Research, Maximize Your Social Impacts
Sign for Notice Everyday Sign up >> Login

DEVELOPMENT OF A STOHASTIC MODEL FOR DETERMINING THE ELEMENTS OF PRODUCTION CYCLE TIME AND THEIR OPTIMIZATION FOR SERIAL PRODUCTION IN METAL PROCESSING INDUSTY AND RECYCLING PROCESSES

Journal: Journal of Engineering Management and Competitiveness (JEMC) (Vol.1, No. 1)

Publication Date:

Authors : ; ; ; ;

Page : 6-9

Keywords : production cycle; serial production; processing industy; recycling processes;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

This project is a continuation (previous ours) project, where it was found that production cycle (PC) time is extremely long in domestic companies. Then, in the National Strategy of Technological Development of Serbia it was pointed out that metal products account for less than 30% of the overall amount of waste, even though the process output contains approx. 70% of recyclable materials. On the other hand, in the lead journals, over the past years there have emerged novel PC management methodologies, coming from Italy, Croatia, Slovenia, Taiwan and Tanzania, indicating the importance of the area which, when involves the need for cleaner production, reaches the very top of attractiveness. That is why the goal of this project is to develop a stochastic model for determining the elements of PC time and their optimization. They will enable quality monitoring and analysis of the PC time, which results in lesser stocks levels and larger turnover of means in the production and recycling processes, raising Serbian metal processing industry competitiveness, with adequate waste management and industrial pollution reduction, and all this to comply with the Decision No 768/2008 of the European Parliament and of the Council of Europe.

Last modified: 2016-01-14 06:52:46