IDENTIFYING THE BOTTLENECKS & INCREASING THE PRODUCTION OF FINISHING AREA IN A STEEL MANUFACTURING PROCESS INDUSTRY ? A CASE STUDY
Journal: International Journal of Engineering Sciences & Research Technology (IJESRT) (Vol.5, No. 4)Publication Date: 2016-04-30
Authors : Anurag Lakhanlal Vaishya;
Page : 1-7
Keywords : Steel Manufacturing &;
Abstract
The motive of this paper is to present an overview to identify the bottlenecks & increasing the production in a fin ishing area of a mill. As it was well known that the rolling area has higher production than the finishing area of the mill. Therefore , with the help of various work study & time study methods, ABC analysis & Fish - Bone analysis & other tools & techniques of industrial engineering , which are one of the most influential & most effective methodologies for eliminating delays associated with the working proc ess in the finishing area of a mill. This methodology helps in identifying the bottlenecks and also finding the NAV (Non - added values) attached with this finishing area of a system. And henceforth this paper concludes with the suggestions as to take the ne cessary action for improving overall performance of a system with the complete assurance of large annual profit margins. This prescriptive paper proposes genuine solutions & results into increment in production of the mill .
Other Latest Articles
- BASIС FEATURES OF PREFABRICATED CONSTRUCTION LOW-RISE BUILDINGS OF THE BLOCK-MODULES IN UKRAINE
- LIGHTWEIGHT CONCRETE BASED GRANSHLAK
- EXTREME MANAGEMENT OF PERFORMANCE GRINDING OF LIMESTONE INTO TWO-CHAMBER BALL MILLS
- THE MARKET VALUE OF THE REAL ESTATE IN A SIGNIFICANT DEVALUATION OF THE NATIONAL CURRENCY
- SYSTEMOLOGY IN DEVELOPMENT AND MANAGEMENT BY PRODUCTIVE SYSTEMS
Last modified: 2016-04-05 22:46:14