PROJECT RESOURCE PLANNING WITH AVAILABLE RESOURCES
Journal: ANNALS OF THE UNIVERSITY of ORADEA Fascicle of Management and Technological Engineering (Vol.25, No. 2)Publication Date: 2016-05-31
Authors : Zvodnimir BOŽILOVIĆ; Nenad NIKOLIĆ;
Page : 33-38
Keywords : construction project; liquidity; optimization; mathematical models;
Abstract
A complex project, as well as in the construction industry requires the engagement of more than one category Work resources use more types of resource-type material and the disposal of the corresponding budget Work resources are usually considered the available amount of time. Resources type of material is characterized by purchases, spending, and inventories. By analogy, is considered the budget: security or inflow of money, payment of costs and liquidity. This paper points to the same time planning the following types of resources and brings together two well-known problems: planning of materials and planning of liquidity.
Other Latest Articles
- THE EFFECT OF WASTE COOKING OIL AND SUNFLOWER OIL BIOFUELS ON PERFORMANCE AND SOOT EMISSION OF A DIESEL ENGINE
- A THERMAL-HYDRAULIC SYSTEM FOR THE CONVERSION AND THE STORAGE OF ENERGY
- REVIEW OF FLEXIBLE MANUFACTURING SYSTEM BASED ON MODELING AND SIMULATION
- DEVELOPMENT OF A CARBON FIBRE FRAME FOR REGIONAL MOTORCYCLING CHAMPIONSHIPS
- SOCIAL PLANNING AS A PEDAGOGICAL TECHNOLOGY OF DEVELOPMENT OF DISCIPLES’ LEADERSHIP POTENTIAL
Last modified: 2016-06-29 17:20:33