Analysis Of Risk, Threshold And Issues And Monitoring Schedule Of Building Construction Using PPM Software
Journal: International Journal of Emerging Trends & Technology in Computer Science (IJETTCS) (Vol.5, No. 3)Publication Date: 2016-07-11
Authors : T.Subramani; Kurian Jacob;
Page : 171-181
Keywords : Keywords: Risk; Threshold; Monitoring Schedule; Building Construction; PPM Software;
Abstract
Abstract Project monitoring and control is the process of collecting, recording, and reporting information concerning project performance. Project controlling uses the data from monitor activity to bring actual performance to planned performance. The present study deals with the project monitoring process of “Standard Design Factory”, a three storied (G+2) factory building whose construction is in progress at Salem, Tamil Nadu. A comparison between the planned progress of construction work and actual progress is performed in this study using project management software Primavera P6. Despite well-established principles and policies of project monitoring the process itself may not be efficiently accomplished in a project, because of those practical problems existing or arising in the project. Such an attempt in realizing the practical problems in implementation of project monitoring and control will contribute to proper recognition of the problem areas and putting in place the control process to rectify the deviations
Other Latest Articles
- Study And Analysis Of Water Level Fluctuation By Using GIS In Tiruppur District
- Water Table Contour For Salem District Tamilnadu using GIS
- Planning And Design Of Irrigation System For A Farm In Tanjavur By Using Remote Sensing
- A Case Study And Analysis Of Noise Pollution For Chennai Using GIS
- Rice Based Irrigated Agriculture Using GIS
Last modified: 2016-07-11 14:51:22