ECOLOGICAL TASKS OF KRASNODAR AND THEIR COST-EFFECTIVE SOLUTION
Journal: The Way of Science (Vol.1, No. 26)Publication Date: 2016-04-20
Authors : Kulikov N.I.; Kulikova E.N.; Prikhodko L.N.; Kadrevich A.A.;
Page : 39-43
Keywords : sewer treatment plant; increase in productivity; equalization; biofertilizers.;
Abstract
To increase the capacity of the sewer treatment plant with a productivity rate of 270 thous. cubic meters per day it can be redesigned to reach the productivity rate of 400 thous. cubic meters per day without constructing additional capacitive facilities by applying a sewage water flow equalization tank operating at scheduled times of day. A direct way to improve the ecological situation in Krasnodar shall be the enhancement of the treatment efficiency of runoff and wastewater subsequently drained into the Kuban river and the implementation of the recycling of wastewater sludge and islands formed in the middle of the dam lake to obtain feed additives, biofertilizers and biogas.
Other Latest Articles
- ON THE OPPORTUNITIES OF COST-EFFECTIVE SOLUTION FOR SEWAGE WATER TREATMENT ON THE EXAMPLE OF TAGANROG
- CALCULATING THE MANUFACTURING COSTS OF A MAINTENANCE KIT
- FREE CAPACITY OF ELECTRIC GENERATING STATIONS
- THE STUDY OF VISCOPLASTIC PROPERTIES UNDER COMPLEX LOADING
- BERBERIS APPLICATION IN TOXIC HEPATITIS THERAPY
Last modified: 2016-07-18 18:06:41