THE REASONS OF DIFFERENTIAL WALL STICKING IN DRILLING OIL AND GAS WELLS
Journal: Academic Journal "Industrial Machine Building, Civil Engineering" (Vol.3, No. 45)Publication Date: 2015-12-25
Authors : Nalivaiko O.; Nalivaiko L.; Reznichenko A.; Chyhyriov V.;
Page : 298-303
Keywords : drill string; differential sticking; osmosis; hydrophobic additive ?Silpan-Р?; well; pressure.;
Abstract
Of the article raised the question of occurrence the causes of differential wall sticking. An attempt to analyze the mechanism of differential wall sticking in drilling oil and gas wells was made. Operations in liquidation of wall sticking and casing pipe that occur in drilling are the most difficult and time-consuming. One of the ways to improve the requirements ofcasing string cementing is the use of different chemical additives in cement that change the structure of well cement. One of them is hydrophobic additive ?Silpan-Р?, which effectiveness is described in the article. Own view on the issue of process occurrence of differential wall sticking that is different from the existing ones was offered.
Other Latest Articles
- PECULIARITIES OF PHASE FORMATION IN REE-CONTAINING NITRATE PRECURSOR SYSTEMS IN PREPARATORY PROCESSES OF CONSTRUCTION OXIDE MATERIALS FORMATION
- JUSTIFICATION SHORT-TERM FORECASTS OF LEVEL OCCUPATIONAL RISK
- EVALUATION OF FIRE CURTAIN WALLS ACCORDING TO CALCULATION METHODS OF EUROCODES
- PECULIARITIES OF ROADS CONSTRUCTION ON THE TERRITORIES OF LOESS LOAM SPREADING
- PROCESSES OF HEAT EXCHANGE IN A PLANAR SOLAR ENERGY COLLECTOR
Last modified: 2016-07-26 15:36:49