Research of groups of straitened limit nature by sizes of site area factors during a reconstruction of plumbing

Journal: Construction, materials science, mechanical engineering (Vol.1, No. 83)

Publication Date:

Authors : ; ;

Page : 100-106

Keywords : site area; labour safety; plumbing; trench.;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

Purpose. The analysis of productive traumatism on site areas testifies that the number of the accidents related to the production, in relation to the volume of the executed works, continues raise. Such tendency takes place, both at new building and at the reconstruction of engineering networks, especially at implementation of works in the straitened terms. Providing of safe production of works at major repairs and reconstruction, having the specific, considerably more difficult, than at erection of new networks and building, because at the production of works on new building, as a rule, working considerably less dangerous and harmful productive factors affect, than at implementation of works on a reconstruction. Very model it touches works at the reconstruction of engineering networks and in a greater degree productions of earthen and assembling works during realization of repair of plumbing. We are consider the features of implementation of repairs, replacements and reconstruction of plumbings networks. Safe organization of the marked types of works has substantial defects still, that affects indexes of productive traumatism. Especially topically this problem is looked over at implementation of the above-mentioned works in the conditions of straitened of site area, created dense municipal building or existent complexes of industrial enterprises. [1] Research of features of implementation building thus - assembling works at a reconstruction and major repairs of plumings networks in the straitened terms, and also an exposure of factors influencing on safety of production of the examined type of works is actual and necessary. Methodology. For research the statistical method of treatment of information, dynamic and logical analysis of traumatism, was used, and also the methods of probability and mathematical statistics theory were used. For creation of model of process of executable earthmovings a design method that allowed to educe and ground the most ponderable factors was used in the straitened terms. [1], [2] Findings..Determination of groups of factors influencing on the safe production of works on major repairs and reconstruction of plumbing networks in the conditions of different of site area, and also suggestion of index of representing the examined groups of factors in totality on safety of productive process allows to choose the most safe chart of production of the reconstruction of plumbing networks in certain terms. Originality. The groups of factors of straitened of site area are shown out, influencing on safety productions of works on the reconstruction of the plumbing systems and well-organized depending on ponderability of their influence on the safe production of works, in general on groups and into each of them, and index offers, representing influence of groups of factors of straitened of site area in totality on safety of productive process. Practical value. The got results allow to work out methodologies of estimation and choice of the most technological and safe charts of production of works on the reconstruction of plumbing networks in the straitened terms.

Last modified: 2016-11-09 23:36:31