ASSESSMENT OF DEVELOPMENT OF WATER CONDUCTING FRACTURES ZONE IN THE MASSIF OVER CROWN OF ARCH OF TUNNELING (CONSTRUCTION)
Journal: International Journal of Civil Engineering and Technology (IJCIET) (Vol.10, No. 2)Publication Date: 2019-03-18
Authors : Gusev V. N Maliukhina E.M Volokhov E.M Tyulenev M. A; Gubin M. Y;
Page : 635-643
Keywords : water conducting fractures zone; boundary curvature; metro tunneling;
Abstract
The hydrogeological conditions for the construction of the subway in St. Petersburg are complex. To avoid water flow in the tunnel, it is necessary to calculate the height of water conducting fractures zone for massif. The article considers the geological structure of the soil in St. Petersburg, the value of the boundary curvature for the massif is calculated. The thickness of the sediments with disturbed water resistance was determined, and the dangerous sections of the tunnel under construction in the NevskoVasileostrovskaya line are indicated.
Other Latest Articles
- THE NAVAL HARBOURS PRIORITY DEVELOPMENT USING ZERO-ONE MATRIX DECISION VARIABLE (ZOMDV) AND FUZZY MCDM METHODS; A CASE STUDY
- HUMAN CAPITAL: THE EVALUATION METHODOLOGY AND DEFINITION OF SCENARIOS OF INNOVATIVE DEVELOPMENT OF THE ORGANIZATION
- GREEN SYNTHESIS OF NANOPARTICLES AND THEIR APPLICATION IN TREATING LEACHATE OF MUNICIPAL SOLID WASTE LANDFILLS – A REVIEW
- EFFECTS OF BARS SLIPPAGE ON THE PREAND POST-HEATING FLEXURAL BEHAVIOR OF FRP REINFORCED CONCRETE BEAMS: EXPERIMENTAL AND THEORETICAL INVESTIGATIONS
- LIFE SKILLS CURRICULUM DEVELOPMENT AT UNIVERSITY
Last modified: 2019-05-21 16:48:59