RISK ASSESSMENT IN SHIP REPAIR SCHEDULING
Journal: International Journal of Mechanical Engineering and Technology(IJMET) (Vol.10, No. 3)Publication Date: 2019-05-22
Authors : MUHAMMAD BADRUS ZAMAN NURHADI SISWANTORO RIZKY R. NANDIANSYAH; SEMIN;
Page : 1-8
Keywords : Project management; risk assessment; scheduling;
Abstract
A shipyard is one of the most important element in the shipping industry for carrying out a job as building and repairing ship. The purpose of this research is developing a recommendation for the shipyard to get the best schedule, and not get the risk of delays in ship repair, in this case, is PT. ASS. The result showed that the delay on ship repair project is using schedule risk delay software is 5 days maximum delay from the designated delay dates. The high impact cause of the delays is bad weather condition and worker accident. In the present work, an attempt has been made to experimentally investigate the performance of a flat plate solar air heater. Experiments were performed to find the energy and exergy efficiency at the different mass flow rate of air. It is observed that for a 16% increase in the mass flow rate of air, energy efficiency increases by 20%, whereas exergy efficiency increases by 36%.
Other Latest Articles
- THE RELATIONSHIP BETWEEN ARCHITECTURAL FORM AND MEANING IN SANTA THERESIA CATHOLIC CHURCH, JAKARTA, INDONESIA
- DOMINANT FISH GROWTH IN DIGOEL RIVER, EDERA DISTRICT, MAPPI REGENCY
- THE PROBLEM OF MORAL PHILOSOPHY IN THE ETHICAL CONCEPT OF THEODOR ADORNO
- BEING COMMUNAL IS THE SOCIO-GENETIC ASPECT OF HUMAN NATURE
- Prevalence of Gene Polymorphisms in Intervertebral Disc Degenerative Diseases
Last modified: 2019-05-22 16:21:29