TECHNICAL RATIONING OF THE CONSTRUCTION TECHNOLOGY OF REINFORCED CONCRETE FLOOR SLABS USING NON-REMOVABLE EMPITNESSLINERS

Journal: International Journal of Civil Engineering and Technology (IJCIET) (Vol.10, No. 2)

Publication Date:

Authors : ;

Page : 2160-2166

Keywords : Technical rationing; Non-removable liners; Holders; Time rate; Production norms.;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

Technically sound standards of time and production standards are designed to improve production efficiency, improve technical and economic indicators of construction enterprises, timely commissioning of buildings and structures being erected, as well as ensuring the proper organization of workers' wages. Labor standards are used in determining the need for construction machinery and equipment, the required number of workers, and also serve as the basis for the development of network and calendar schedules that are part of the construction organization project (POS) and the production work plan (CPD). Standards of time and standards for the production of most of the construction work are contained in the collections of EPR and GESN. However, in the conditions of continuous development and introduction of new production technologies, there is a need to update and refine the existing technical regulation database. Standards of time, corresponding to the modern level of technical development and reflecting the advanced experience of workers, allow you to make the right choice when analyzing the most economical ways of producing work. Definition and removal of production standards is to determine the weighted average number of working hours to perform a particular technological operation, while taking into account the conditions of production of this workflow, the numerical and qualification composition of workers