ResearchBib Share Your Research, Maximize Your Social Impacts
Sign for Notice Everyday Sign up >> Login

Lean Manufacturing Implementation Using Value Stream Mapping to Eliminate Seven Waste in Painting Process

Journal: International Journal of Mechanical and Production Engineering Research and Development (IJMPERD ) (Vol.9, No. 2)

Publication Date:

Authors : ; ;

Page : 749-758

Keywords : Lean; Value Stream Mapping; Waste; 5W1H; VA & NVA;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

Gas stove producers faced intense competition in the market. This condition encourages gas stove producers to increase productivity by reducing 7 (seven) waste in the production process, especially in painting process. The purpose of this study is to determine the factors that can affect the reduction of 7 (seven) waste in the production process, knowing the number of Value Added (VA) and Non Value Added (NVA) in the reduction of 7 (seven) waste. The method used to identify waste is the Value Stream Mapping, for analysis of repairs used 5W 1H tools. VSM can provide a description of the material flow, and information during the production process, starting from the arrival of raw materials from suppliers to the delivery of finished products. From the calculation, a decrease in lead time by 1098.3 seconds and a decrease in NVA of 332.3 seconds were obtained.

Last modified: 2019-06-14 20:55:46