ALLOWANCE SETTING OF THE OPERATIONS, WHICH ARE PERFORMED ON THE CONVEYOR PLANTS AT PRODUCTION OF CIRCUIT PLATES
Journal: The Way of Science (Vol.1, No. 51)Publication Date: 2018-05-31
Authors : Alenchenkova L.V. Alenchenkov G.S. Alenchenkov I.S.;
Page : 28-30
Keywords : time allowance; labor process; processing of circuit plates; conveyor; overlapping time.;
Abstract
In this article one of the possible methods of allowance setting of the operations on production of the circuit plates, which are performed on conveyor plants, is suggested. The main issues at allowance setting on production of circuit plates and ways of their solution are considered. The mathematical models describing time allowance for the production operation, which is carried out on the conveyor, are given.
Other Latest Articles
- MATHEMATICAL MODEL OF THE PROCESSING OBJECT’S MOVEMENT ON THE TRANSFER ROTARY DEVICE
- THE DEVELOPMENT OF GREEN INFRASTRUCTURE IN THE CAPITAL REGION
- THE SUMMER ORNITHOFAUNA OF ALFALFA FIELDS IN THE FOOTHILLS OF THE CHATKAL RANGE
- THE STUDY OF TEMPERATURE INFLUENCE ON THE PARTICLE SIZE OF NIOSOMAL DISPERSION
- THE ABSTRACT HYPERBOLIC EQUATIONS WITH QUASI-ELLIPTIC PART
Last modified: 2018-11-13 18:56:40