In this article one of the possible methods of allowance setting of the operations on production of the circuit plates, which are performed on conveyor plants, is suggested. The main issues at allowance setting on production of circuit plates and ways of their solution are considered. The mathematical models describing time allowance for the production operation, which is carried out on the conveyor, are given.