OPTIMAL PLACEMENT OF PHASOR MEASURING UNIT IN POWER SYSTEM
Journal: International Journal of Engineering Sciences & Research Technology (IJESRT) (Vol.10, No. 4)Publication Date: 2021-04-30
Authors : Shikha Chaudhary Kuldeep Singh Kooner Baljeet Singh;
Page : 38-42
Keywords : phasor measuring unit (PMU); PSAT; observability.;
Abstract
This paper present different methods for optimal placement of phasor measuring unit (PMU) in power system for complete observability of the system. For smooth and efficient working of the system installation of phasor measuring unit become necessity. But due to high cost of PMU, it is not feasible to place it on every bus system. So, optimization becomes the crucial need. In present work for optimization power system toolbox (PSAT) is used. The proposed methods have been used and verified on IEEE-6, IEEE-9 bus system.
Other Latest Articles
- THE EFFECTS OF FAT TYPE IN MEAT EMULSION ON COLOUR, TEXTURE AND CONSUMER ACCEPTABILITY OF CHICKEN MEAT SAUSAGES
- DOES INTRINSIC AND EXTRINSIC MOTIVATION AFFECT TO EMPLOYEE PARTICIPATION IN TRAINING?
- DHARWAD INDICES
- ANALYSIS OF 3D PRINTED VS CONVENTIONALLY MACHINED FSAE UPRIGHTS
- شناسایی و تحلیل پیشرانهای راهبردی دانشگاه کارآفرین با بهرهگیری از رویکرد تحلیل تأثیرات متقابل
Last modified: 2021-06-30 08:49:24