The G-2 Modular Construction Project Delay Factors at Golden Veroleum Liberia

Journal: International Journal of Scientific Engineering and Science (Vol.6, No. 1)

Publication Date:

Authors : ; ; ;

Page : 133-136

Keywords : ;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

—In a work plan, it is often found that there are factors that will become obstacles in completing a project, both internal and external factors in the project. The same thing also happened to the G-2 modular housing development project in Golden Veroleum Liberia which experienced operational constraints. Therefore, this study aims to analyze the most dominant factors influencing the delay in construction of the G-2 Modular housing in Golden Veroleum Liberia. This research is a quantitative survey research in which questionnaires and interviews as a data collection tool are distributed to respondents, the data obtained is validated and also tested for reliability before further analysis using factor analysis and multiple linear regression. The results of the multiple regression analysis obtained that there are two variables that significantly affect work delays: (1) the problematic place characteristic factor (X4) with value β = 0.144, t = 3.928 and Sig = 0.000, (2) the lack of workforce expertise (X1) with value β = 0.098, t = 2.431 and Sig = 0.019. Based on the results of data analysis, the Characteristics of the problematic place is the most dominant factor affecting work delays.

Last modified: 2022-02-24 15:09:50