Evaluation of the management building control system and implementation of the buildability in construction companies of civil works
Journal: Journal Boliviano de Ciencias (Vol.15, No. 45)Publication Date: 2019-04-30
Authors : Elizabeth M. Vásquez Salazar;
Page : 40-49
Keywords : Engineering; Architecture;
Abstract
During the execution of projects, there are usually problems of delays in execution times, poor resources management and poor work quality, among others; generating in this way, change orders, modifying contracts and contract rescissions. To this, it is added that most entities in charge at national leve[ do not have a unified methodology far the control of construction processes, on the contrary, each one handles its own format that, in sorne cases, are not useful far control and/or of people or organisms intervention who exercise the supervision and construction of the works, therefor, the objective of this study is to evaluate the management control system and implementation of the buildability in companies from Cochabamba. The methodology of the study consisted in the application of a questionnaire to key personnel of 20 construction companies in the city of Cochabamba, totaling 57 surveys. The results show that not ali the companies present an adequate management far the construction of their works and a lack of knowledge of the term "buildability"; however, most companies are willing to implement it in arder to improve the productivity of their processes.
Other Latest Articles
- The nudging effect towards a plant-based diet. A systematic review
- Pressed soil-cement blocks asan ecological alternative against the traditional cooked clay bricks
- Editorial
- Water influence determination of Tiquipaya Municipality in the resistance to the concrete compression
- Analysis of the debris mud flow of Tiquipaya - Bolivia 2018: identification of causes, risks and actions
Last modified: 2025-02-25 04:54:04