DETERMINATION OF SIGNS OF MALFUNCTION OF PRECIPICE OF WIRE IN AIR LINES OF ELECTRICITY TRANSMISSION BY TENSION OF 6-35КВ
Journal: Electromechanical and energy saving systems (Vol.2, No. 14)Publication Date: 2011-06-30
Authors : М. Кutina;
Page : 145-149
Keywords : precipice of wire; air grid; current of reverse sequence.;
Abstract
It is shown that as a sign of precipice of wire of air-track of electricity transmission it is expedient to use the value of currents of reverse sequence at the beginning of line to the moment of falling of wire on earth, and value of current of a zero sequence after falling of wire on earth. For the air-tracks of the operating systems the value of current of reverse sequence is investigational an electricity transmission depending on the place of precipice and place of origin of di-phasic short circuit.
Other Latest Articles
- MATHEMATICAL MODEL OF TRAM DRUM-SKIDZ BRAKE DIAGNOSTICATING
- POINT-TO-POINT CONTROLLER PARAMETERS SYNTHESIS BY N-i SWITCHING METHOD FOR TIME-OPTIMAL SLIDING MODE CONTROL SYSTEM OF ELECTRIC DRIVE WITH ELASTIC TRANSMISSION MECHANISM
- EXPERIMENTAL RESEARCH OF THE THERMAL STATE FREQUENCY-GUIDED ASYNCHRONOUS MOTOR IN NON-STATIONARY MODES
- SWITCHED RELUCTANCE MOTOR DRIVE IN TRACTION TORQUE LOAD MODE
- PROBLEM OF INTRODUCTION OF METHODS OF FORECASTING OF CHANGE OF INDICATORS RELIABILITY OF DC MOTOR
Last modified: 2015-06-04 00:23:44