TURBINE RUNNER HEALTH AND THE EXIGENCIES OF PRODUCTION UNDER POWER MARKET REFORMS
Journal: International Journal of Electrical Engineering and Technology (IJEET) (Vol.6, No. 8)Publication Date: 2015-10-28
Authors : MARIALIS ÇELO;
Page : 26-36
Keywords : Iaeme Publication; IAEME; Electrical; Engineering; IJEET; Hydroelectric Power Plant; Hydro Mechanical Equipment; Tail Water; Vibration Measure; Runner Blade; Cavitation Damages; Market Power;
Abstract
The reforms undertaken on the Albanian Power Sector strated in 2004 with the unbundling process of Public Utility - KESH focused on functional unbundling as per the three core activities : generation, transmission and distribution & retail supply , accounting unbundling , i.e. identification of costs for each service/function and Legal unbundling (corporatization) . As a result of this process t he Transmission System Operator was registered firstly as Joint Stock Company on 2004 and in 2005 the Transmission System Operator was legally unbundled. I n 2008 the Distribution System Operator (performing the retail service as well) was legally unbundled .
Other Latest Articles
- EFFECT OF SURFACE TENSION ON KELVIN-HELMHOLTZ INSTABILITY
- NUMERICAL CRITERIA FOR ROBUST CONTROL OF CONTINUOUS SYSTEMS
- IRAQI PREPARATORY SCHOOLS TEACHERS' ATTITUDES TOWARD USING COMMUNICATIVE APPROACH AS A TEACHING METHOD FOR IRAQ OPPORTUNITIES TEXTBOOK
- A NOVEL BROADCASTING METHOD FOR CODE DISSEMINATION IN WIRELESS SENSOR NETWORKS
- CELLULAR COMMUNICATION BASED REMOTE PREDICTIVE MAINTENANCE SYSTEM FOR POWER TRANSFORMERS
Last modified: 2016-06-06 18:21:52