Comparative Analysis of MIVAN Formwork Building and Conventional Formwork Building Based on Cost and Duration

Journal: International Journal of Engineering Research (IJER) (Vol.5, No. 8)

Publication Date:

Authors : ; ;

Page : 672-675

Keywords : MIVAN formwork; Conventional formwork; Detailed estimation; Duration; Comparison;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

The project involves detailed cost estimation and duration analysis of a building constructed by MIVAN formwork and Conventional formwork. The buildings are of G+21 floors where the saleable area of building with Mivan formwork is 8747.28 S.ft and that with Conventional Method is 9786.67 Sft on each floor with 3.0 m as the height of each floor. Later comparative analysis is done on cost and duration of both the buildings.