Comparative Analysis of MIVAN Formwork Building and Conventional Formwork Building Based on Cost and Duration
Journal: International Journal of Engineering Research (IJER) (Vol.5, No. 8)Publication Date: 2016-08-01
Authors : Danish Sadruddin Ansari; Pratik Sudhakar Kudale;
Page : 672-675
Keywords : MIVAN formwork; Conventional formwork; Detailed estimation; Duration; Comparison;
Abstract
The project involves detailed cost estimation and duration analysis of a building constructed by MIVAN formwork and Conventional formwork. The buildings are of G+21 floors where the saleable area of building with Mivan formwork is 8747.28 S.ft and that with Conventional Method is 9786.67 Sft on each floor with 3.0 m as the height of each floor. Later comparative analysis is done on cost and duration of both the buildings.
Other Latest Articles
- Short Term Trend of Streamflow in West Coast of India
- Need and Usage of Traceability Matrix for Managing Requirements
- Numerical Analysis of Premixed Combustion in Heating Plate by T-type Ejector
- CFD Analysis and Comparision of Spiroid and Dual Feather Winglets
- An Experimental Study on Stabilization of Black Cotton Soil by Using Quarry Dust and Lime Mixture
Last modified: 2016-08-08 16:06:46