ResearchBib Share Your Research, Maximize Your Social Impacts
Sign for Notice Everyday Sign up >> Login

To Minimize Construction Cost and Time of Panvel-Karjat Suburban Corridor (Under MUTP-3A) by Implementation of Value Engineering Aspect

Journal: International Journal of Science and Research (IJSR) (Vol.10, No. 5)

Publication Date:

Authors : ;

Page : 1285-1290

Keywords : Value Engineering; Construction Cost; Time;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

Mumbai Metropolitan Region (MMR), contributing about 8 percent of India?s GDP, is home for about 22 million people. The Mumbai Metropolitan Regional Development Authority (MMRDA) anticipates the population in MMR to grow by about 42 percent to 28.4 million in 2025 and by 54 percent to 30.87 million in 2036. The Mumbai suburban railway, the main lifeline of the commuter?s flow from the suburban to the Central Business District. The Asian Infrastructure Investment Bank (AIIB) is considering providing loan assistance for double line suburban corridor between Panvel and Karjat section of 30 RKm on Central Railway under the MUTP-III Project. Since this Study state that how can we execute this corridor by utilizing the available Assets, Resources by reducing the Project Cost and Time also by 5-7 % Min to Max 10-12%, by using Value Engineering Terminology.

Last modified: 2021-06-26 18:57:34